The engine rebuild is making progress, with many parts having been refurbished. New liners and pistons are being fitted as the existing ones have sustained wear and some damage. In the first photograph, the new pistons are seen lined up after unpacking, and in the second the old pistons are seen with connecting rods still attached.
The gudgeon pins were then removed and the connecting rods fitted to the new pistons.
The pistons are seen here installed in the engine and in the last photograph the first of the two cylinder heads can be seen during the fitting process..